Invisible_S-Curve

Sale price¥59,400
¥59,400 ¥53,460
10% OFF

Side Table, Trolley / 420 x 280 x 511 mm

*Disclaimer: This product is designed as a side table. Do not use it as a chair or step stool. Improper use may result in damage or injury.


Made-to-Order Item

This product is a handcrafted, made-to-order item. Please note that production begins after the order is placed and takes approximately 2 weeks to complete. Shipping will begin once the production is finished.

Please note that this item is made-to-order product and cannot be canceled, exchanged, or refunded due to a change of mind.

Invisible_S-Curve

Product Specification

Explore the thoughtful details and craftsmanship behind every product. From vibrant colors to durable materials, each piece is designed with care to blend seamlessly into your life while standing out in its own unique way.

Unit: Millimeters (mm)

Dimensions

Precise proportions designed to fit
beautifully into your space.

Elegant curves and a versatile compact design enhance any space.

Description

Refined Curves

Invisible_S-Curve redefines fluidity in furniture. Its sculptural silhouette in crystal-clear acrylic brings sophistication without weight — visually or physically.

Description

Form Follows Function

Built for durability and designed for daily use, the S-curve structure offers dual-level storage with a graceful, architectural feel.

Description

Quietly Bold

The transparent body blends in, while the design stands out. It’s a storage piece, a display stage, a quiet showstopper.

Testimonials

Jisoo K.

APTONE completely transformed the feel of our home.

The colors are incredibly tasteful—unique yet effortlessly blend into the space. Guests always ask where we got it!

David L.

I’m impressed with the quality. It looks even better in person.

The finish is flawless, and you can tell it’s been crafted with care. The soft curves and seamless joints feel truly high-end.

Emiko T.

You can’t find this kind of design easily, even in Japan.

It’s hard to find pieces this well-made with such unique colors. It instantly became the highlight of my living room.

Our designs are legally protected under applicable design protection laws.

All designs created by APTONE are protected by design rights and intellectual property laws.
Any unauthorized use, reproduction, or imitation may constitute an infringement and may result in civil and/or criminal liability under relevant laws.

FAQ

Here are some popular questions from our customers!